Solar Permit Timeline: What Homeowners Should Know

Understand the solar permit process, including timelines, necessary steps, and tips for avoiding delays to ensure a smooth installation.

Apr 19, 2025

Renewable Energy

Getting solar panels installed? Here's what you need to know about permits:

  • Why Permits Matter: They ensure your system is safe, meets building codes, and integrates with the grid properly.

  • Timeline: Permit approvals usually take 2–8 weeks, depending on your location and system complexity.

  • Steps to Get Permits:

    1. Plan your system (size, design, equipment).

    2. Submit an application with all required documents.

    3. Wait for review (2–8 weeks).

    4. Schedule a final inspection after approval.

  • What Affects Timing: Larger systems, stricter local rules, and busy offices can cause delays.

  • Tips to Speed Up:

    • Work with experienced installers.

    • Use tools like Voltify for design and Sun4Good.net for digital submissions.

    • Prepare all documents early and stay in touch with your installer.

Start early, plan for potential delays, and use digital tools to simplify the process.

4 Main Steps to Get Solar Permits

1. Plan Your Solar System

Start by planning your system. This includes determining the size, panel arrangement, and equipment you'll need. Tools like Voltify can simplify this process by using your zip code, shading information, and energy usage to create a tailored plan.

2. Submit the Permit Application

Prepare and submit your permit application. This typically includes forms, design plans, and engineering calculations. Double-check all details to prevent delays, which could stretch into several weeks.

3. Permit Review Process

Once submitted, permitting officials will review your application to ensure it meets code requirements. This step can take anywhere from 2 to 8 weeks, depending on how busy your local office is.

4. Schedule the Final Inspection

After your permit is approved, arrange for a site inspection. This step ensures your installation is up to standard before connecting to the grid.

Why Isn’t My Solar Turned On Yet?

What Affects Permit Timeline

Once your application is submitted, several factors will influence how long you'll wait for approval. The typical permit timeline ranges from 2 to 8 weeks, depending on three main elements: system size, local regulations, and the workload of the permit office. These factors determine whether your review falls on the quicker or slower end of that range.

System Size and Design

Larger systems or those with complex designs often require more detailed engineering and safety reviews, which can add time to the process.

Local Rules and Requirements

Each jurisdiction has its own zoning laws, building codes, HOA guidelines, and utility interconnection standards. These requirements may involve additional documentation and steps, which can lengthen the timeline.

Permit Office Workload

The volume of applications, seasonal construction surges, and staffing levels at the permit office can all impact how quickly approvals are processed. Using services like Sun4good.net and Voltify can help make submissions more efficient.

How to Speed Up Your Permit Process

Once you've identified the common causes of delays, you can take steps to speed up your solar permit approvals. While timelines differ depending on your location, starting off on the right foot can help you avoid unnecessary hold-ups and save weeks - or even months.

Work with Experienced Installers

Partnering with skilled solar installers is key to avoiding permit headaches. Professionals with local expertise know the requirements inside and out, ensuring your application is complete and accurate from the start. Platforms like Voltify connect you with trusted installers who have a history of success with local permitting offices. Another option, Sun4good.net, helps you find certified installers and simplifies the submission process.

Take Advantage of Digital Tools

Streamline the process by using online platforms designed to handle design, quotes, and documentation efficiently:

  • Voltify: Combines satellite imagery with address data to create optimized layouts and installer quotes in less than a minute.

  • Sun4good.net: Facilitates digital permit submissions and offers real-time tracking tailored to local requirements.

Plan Ahead for Potential Delays

Even with the best preparation, delays can happen. Minimize their impact by taking these steps:

  • Gather documents early: Have property records, electrical diagrams, and structural details ready before submitting your application.

  • Maintain communication: Stay in touch with both your installer and the permit office to quickly resolve any issues or questions.

  • Build in extra time: Add a buffer of 2–3 weeks to your project timeline to account for unexpected setbacks.

Conclusion

The timeline for solar permits largely depends on system design, local rules, and how busy the permit office is. By working with skilled installers and leveraging digital permit tools, you can simplify the process and sidestep common setbacks. Having property records, electrical diagrams, and structural details ready ensures your project stays on schedule.

"Got my house done through Sun4Good - competitive pricing and an easy process. 10/10!"

  • Rena Orly, Homeowner

Want to simplify your solar installation? Keep reading or dive straight into securing permits and getting quotes.